As a professional estimator I generally have to be closer than that. HOWEVER, when it comes to "honey dew" projects the rule of thumb is twice as long to do with a 20% cost overrun. Plumbing projects are totally ad lib and are only limited by infinite time and space along with someone's life savings.
As a professional estimator I generally have to be closer than that. HOWEVER, when it comes to "honey dew" projects the rule of thumb is twice as long to do with a 20% cost overrun. Plumbing projects are totally ad lib and are only limited by infinite time and space along with someone's life savings.
ReplyDeletenot me...I just do it..ha
ReplyDeleteI never estimate on personal projects. I pick away at them until they either get done or die of boredom.