Saturday, December 2, 2017

So what's new at the museum you ask?

Well, you can no longer tell that a window ever existed in the wall where we took one out, at least not from inside the museum. A local contractor who specializes in plastering finished mudding and sanding a few days ago. That wall is now as smooth as the clichéd baby's butt. It is ready for painting so one of these days I'll probably prime it. Maybe. Given that the museum has hardwood floors as well as a lot of stuff we really don't want paint splatters on, that may be another task that gets contracted out. If I take a brush or roller in hand, we will end up with mystery splatters landing 30 feet away.
In any case, now that the plastering is done, we can do some shuffling and use that particular space as a staging area while we get to work in the hallway creating a doorway to improve the traffic flow and dissuade visitors from cutting through the office. Once that door is in, then we will paint for sure, both the newly drywalled space, the hallway, and exhibit area side of the wall we cut through. The doorway creation should be fairly fast and easy unless we run into weirdness with the way the electrical lines run through the wall. And you know we will run into weirdness. The past five years of volunteering at the museum have taught me that.
The toy in the foreground is a Buddy L steam shovel from the 1920's.

No comments:

Post a Comment

My space, my rules: play nice and keep it on topic.